Stalin Inspects Adyar River Dredging Ahead of Heavy Rains
Stalin inspects the ongoing dredging and desilting works at the Adyar River mouth in Chennai, emphasizing the importance of pre-monsoon preparedness to prevent flooding in vulnerable areas. The Chief Minister reviewed the progress made by the Water Resources Department (WRD) and directed officials to ensure the seamless flow of stormwater into the sea during heavy rainfall.

During his visit, Stalin was accompanied by senior officials, including Chennai Corporation Commissioner J. Radhakrishnan and WRD engineers. The team briefed him on the measures being implemented to improve water discharge capacity and avoid stagnation in residential zones along the riverbank.
The inspection forms part of a larger flood prevention initiative launched by the state government, focusing on key waterways such as the Cooum, Adyar, and Buckingham Canal.
Stalin Inspects Flood Mitigation Works to Strengthen City Infrastructure
As part of his field review, Stalin inspects other ongoing flood mitigation works in Chennai’s coastal regions. The dredging at Adyar River mouth is being carried out using heavy machinery to remove silt and sand deposits that block natural water flow during rains.
Officials explained that the buildup at the river mouth often restricts the outflow of rainwater, leading to waterlogging in low-lying neighborhoods like Kotturpuram, Saidapet, and Adyar. By deepening and widening the stretch, authorities aim to minimize backflow during high tides and heavy showers.

The Chief Minister emphasized the need for continuous monitoring during the northeast monsoon. He urged departments to maintain coordination and ensure that all drainage channels remain clear. Special attention is being given to high-risk areas that experienced severe flooding during the 2021 and 2023 monsoons.
Stalin Inspects Site and Reviews Measures for Sustainable Drainage
During the inspection, Stalin reiterated his government’s focus on sustainable solutions rather than short-term measures. He instructed engineers to strengthen embankments, improve stormwater connectivity, and ensure that dredged materials are disposed of without causing environmental harm.
Authorities have been asked to identify and rectify bottlenecks that slow down water movement in the Adyar basin. The WRD has deployed additional workforce and machinery to accelerate the project before the onset of heavy rains.

The Chennai Corporation has also taken steps to clear stormwater drains across major roads and subways. Officials said that several vulnerable junctions have been mapped for real-time monitoring through the city’s flood management control centre.
Stalin Inspects Coordination Efforts Between Key Departments
Stalin inspects and reviews coordination efforts between the WRD, Greater Chennai Corporation, and disaster management teams. He highlighted the importance of inter-departmental response during emergencies to ensure timely evacuation and relief if flooding occurs.
The Chief Minister also spoke to local residents and assured them of swift action to prevent a repeat of past flood incidents. Residents expressed relief that dredging work had begun early this year, giving them hope for a smoother monsoon season. Also Read: Chennai People Be Ready: Cyclone ‘Montha’ May Bring Heavy Rains and Strong Winds on October 27
Officials stated that similar inspections are planned across other river systems, including Kosasthalaiyar and Kovalam, to assess progress on flood control projects.
Conclusion:
Stalin inspects and reinforces the Tamil Nadu government’s commitment to monsoon readiness, aiming to safeguard Chennai from flooding through timely and sustainable infrastructure work. The Chief Minister’s proactive field visit underlines the administration’s focus on protecting citizens and ensuring the city’s drainage systems remain efficient as the northeast monsoon approaches.

